Headquarters: Alameda, California, USA
Under Construction
Broke ground April 2026, the first power-producing Gen IV reactor to receive a US construction permit. First deployment under Kairos's fleet agreement with Google.
At a Glance
- Reactor design
- Hermes 2
- Reactor type
- Fluoride salt-cooled high-temp reactor
- Electrical output
- ~50 MW
- Status
- Under Construction
- Target
- ~2030 (Oak Ridge, TN)
- Est. cost
- Not publicly disclosed
- Offtake / PPA
- Direct PPA with Google
Cost basis: Undisclosed. Most SMR cost figures at this stage are vendor targets or first-of-a-kind project budgets, not audited fleet costs. Where a developer has not published a figure, this page says so rather than estimating one.
Highlights
- Cost: not publicly disclosed — no cost per kW published.
- Offtake: Direct PPA with Google.
- Target: ~2030 (Oak Ridge, TN).
Sources
Profile last checked: November 14, 2026
Know something we got wrong?
Corrections welcome: send us the detail and, if you can, the source, and we will fix the page.