TerraPower
Headquarters: Bellevue, Washington, USA
Under Construction
Backed by Bill Gates. Full construction began April 2026 at Kemmerer, on the site of a retiring coal plant. Pairs a fast reactor with molten salt storage for peak output.
At a Glance
- Reactor design
- Natrium
- Reactor type
- Sodium-cooled fast reactor
- Electrical output
- 345 MW (500 MW peak)
- Status
- Under Construction
- Target
- 2030–2031 (Wyoming)
- Est. cost
- ~$4.0B total project
- Cost per kW
- ~$11,600/kW
- Offtake / PPA
- Forward offtake agreement with Meta (capacity undisclosed)
Cost basis: Disclosed (~50% DOE-funded). Most SMR cost figures at this stage are vendor targets or first-of-a-kind project budgets, not audited fleet costs. Where a developer has not published a figure, this page says so rather than estimating one.
Highlights
- Published cost: ~$4.0B total project (~$11,600/kW), tracked in the directory as: disclosed (~50% doe-funded).
- Offtake: Forward offtake agreement with Meta (capacity undisclosed).
- Target: 2030–2031 (Wyoming).
Sources
Profile last checked: November 14, 2026
Know something we got wrong?
Corrections welcome: send us the detail and, if you can, the source, and we will fix the page.