The Scoreboard

Announced nuclear capacity tied to data centres, from the deals below
–
Total announced capacity across the tracked deals (up-to figures, as announced)
–
Deals tracked on this page
–
Largest single deal: –
–
Tech giants buying: Amazon, Google, Meta, Microsoft
Figures are the headline capacities from the companies' own announcements. Most are "up to" numbers spanning the 2030s, and most of this power is not flowing yet. Deal-by-deal sources are the announcing companies; see each card.

The Deal Tracker

Every entry is a deal the companies themselves have announced. Filter by the buyer to see one company's book at a time.

No deals match that filter yet.


How much power is that?

Deal announcements live in megawatts, which nobody can picture. Move the slider to a deal size and see what it means in homes and in reactors.

MW
–
Homes powered, roughly
–
BWRX-300 reactors (300 MW each, GE Vernova Hitachi)
–
Natrium reactors (345 MW each, TerraPower)
–
ARC-100 reactors (100 MW each, ARC Clean Energy)
–
Xe-100 reactors (80 MW each, X-energy)

Assumption: 1 MW of around-the-clock nuclear capacity serves roughly 1,000 homes, the standard industry rule of thumb. Reactor counts are nameplate sizes rounded up to whole units. Real output depends on the plant, the grid, and the year. Try 835 MW: that's the Three Mile Island restart. Try 1,200: that's the full four-unit Darlington SMR site Ontario is building toward.

The Ontario Angle

Every deal above is American so far. The same pressure is building in Ontario, and Ontario starts from a stronger position than most places pitching for this load.

The IESO, Ontario's grid operator, counts data centres among the top new drivers of electricity demand in its 2025 Annual Planning Outlook: about 13 per cent of all new demand by 2035, with roughly 16 more data centres expected to connect to the grid over the next decade. The province has since launched a Data Centre Playbook to market itself to builders, and the selling point is the grid itself: most of Ontario's electricity already comes from nuclear and hydro, so a data centre plugged in here runs mostly on power that is already emissions-free.

And the province making that pitch is the same one building the first BWRX-300 SMRs at Darlington, with more Canadian projects behind it in Saskatchewan and New Brunswick. If a data-centre builder wants firm, clean power in Canada, the nuclear supply story is already being built here. See where on the SMR Map, and compare the companies in the SMR Directory.


Watch This Space

No Canadian data-centre deal tied to nuclear power has been announced yet. When one lands — a Canadian campus buying nuclear power, an Ontario hosting deal, an SMR offtake north of the border — it goes on this page, and the scoreboard above changes. This page is updated as announcements land; the date at the top is the date of the last check.