Headquarters: Bellevue, Washington, USA
Under Construction

Backed by Bill Gates. Full construction began April 2026 at Kemmerer, on the site of a retiring coal plant. Pairs a fast reactor with molten salt storage for peak output.

At a Glance

Reactor design
Natrium
Reactor type
Sodium-cooled fast reactor
Electrical output
345 MW (500 MW peak)
Status
Under Construction
Target
2030–2031 (Wyoming)
Est. cost
~$4.0B total project
Cost per kW
~$11,600/kW
Offtake / PPA
Forward offtake agreement with Meta (capacity undisclosed)
Cost basis: Disclosed (~50% DOE-funded). Most SMR cost figures at this stage are vendor targets or first-of-a-kind project budgets, not audited fleet costs. Where a developer has not published a figure, this page says so rather than estimating one.

Highlights

← Back to the SMR Directory See projects on the SMR Map Compare the Natrium with another design Official website
← Previous: GE Hitachi Nuclear Energy Next: Kairos Power →

Sources

Profile last checked: November 14, 2026

Know something we got wrong? Corrections welcome: send us the detail and, if you can, the source, and we will fix the page.