✓Listing reviewed and corrected by NuScale Power · November 2026
NuScale Power
Headquarters: Portland, Oregon, USA
NRC Standard Design Approval
The only SMR with full US NRC design certification. Its original US project was cancelled in 2023; the lead project is now RoPower's Doicești site in Romania, conditional FID approved Feb 2026.
At a Glance
- Reactor design
- NuScale Power Module™
- Reactor type
- Pressurized light-water SMR
- Electrical output
- 77 MWe per module; scalable up to 12 modules (924 MWe)
- Status
- NRC Standard Design Approval (77 MWe)
- Target
- Early 2030s
- Est. cost
- Not publicly disclosed
- Cost per kW
- Not publicly disclosed
- Offtake / PPA
- TVA in active talks via commercialization partner ENTRA1, not yet signed
Highlights
- The only SMR with Standard Design Approval from the US NRC for its 77 MWe design (May 2025).
- Its original US project was cancelled in 2023; the lead project is now RoPower's Doicești site in Romania, conditional FID approved Feb 2026.
- Signed agreement with Doosan Enerbility for fabrication of the first upper reactor coolant system assembly.
Sources
- NuScale Power (official website)
- US Nuclear Regulatory Commission (NRC), standard design approval for the 77 MWe design (May 2025)
- Tennessee Valley Authority (TVA) project discussions via ENTRA1
- Entry reviewed and corrected by NuScale Power, November 2026
- Company announcements and public reporting tracked in the NuclearVox SMR Directory
Profile last checked: November 19, 2026