SMR Directory · CNEA
Photo pending
CNEA logo

CNEA

Headquarters: Argentina
Under Construction

Argentina's domestically developed integral pressurized water SMR, and one of the longest-running SMR construction projects globally.

At a Glance

Reactor design
CAREM-25
Reactor type
Light-water SMR
Electrical output
25–30 MW
Status
Under Construction
Target
Atucha site, Argentina
Est. cost
Not publicly disclosed
Offtake / PPA
None publicly disclosed
Cost basis: Reported cost overruns, no confirmed figure. Most SMR cost figures at this stage are vendor targets or first-of-a-kind project budgets, not audited fleet costs. Where a developer has not published a figure, this page says so rather than estimating one.

Highlights

← Back to the SMR Directory See projects on the SMR Map Compare the CAREM-25 with another design Official website
← Previous: ARC Clean Energy Next: CNNC →

Sources

Profile last checked: November 14, 2026

Know something we got wrong? Corrections welcome: send us the detail and, if you can, the source, and we will fix the page.